massdev.net
Development on a Massive Scale

Sign in | Help
in

Browse by Tags

  • Blacksmith-Engineer/2D Art/Closed

    Task Priority = Direct Asset Required = 2D character art Deadline = before 9pm sunday 20 May 2007 Output Specification = It is for the character task, so we would optimally need 6 drawings (2 genres, each with 3 armor levels), but that being preposterous, one male and one female should be enough. Images...
    Posted to Complete (Forum) by arthursa on 05-17-2007
  • Gardener-Biochemist/2D Art/Closed

    If there is anything wrong with the format, please, forgive me and point it ;) Task Priority = Direct Asset Required = 2D character art Deadline = before 9pm sunday 20 May 2007 Output Specification = It is for the character task, so we would optimally need 6 drawings (2 genres, each with 3 armor levels...
    Posted to Complete (Forum) by arthursa on 05-17-2007
Page 1 of 1 (2 items)
Site Design by Shawn Hyde ∙ ©2007-2009 MassDev, all rights reserved.